## [20200310] - 2021-03-10
- Fixed a bug in phase-wise power control that was not properly detecting the roles.
- Removed SolarEdge special scaling as it is now in the driver
- Updated the SolarEdge driver (7086) to include the dynamic scaling

## [20210407] - 2021-04-07
- Updated the display issue for negative percentages

## [20210416] - 2021-04-16
- Fixed a bug where multiple DGs with the same priority were not showing

## [20210420] - 2021-04-20
- Fixed a bug in power control calculation

## [20210426] - 2021-04-26
- Reworked all the drivers to ensure encryped content was proper

## [20210518] - 2021-05-18
- Fixed some bugs in power control algorithms

## [20210521] - 2021-05-21
- Updated algorith for inverter-wise setup

## [20210616] - 2021-06-16
- fixed a bug in PC and added Schneider 25kw

## [20210702] - 2021-07-02
- fixed some bugs with curtailment

## [20210805] - 2021-07-02
- goodwe ht fix

## [20211125] - 2021-11-25
- added software watchdog timeout
- reworked the interfaces with options for enabled and disabled meters

## [20211224] - 2021-12-24
- added reactive power control

## [20220216] - 2022-02-16
- removed debug info

## [20220311] - 2022-03-11
- updated reactive power control for Sungrow 7092 & 7095
- kstar fix
- Solax power control
- updated a bug where rebooting could happen from PCSec

## [20220318] - 2022-03-18
- fixed a memory issue in sungrow
- fixed a  bug in PCsec for legacy code

## [20220519] - 2022-05-19
- added TCP connection monitoring and fallback percent

## [20221208] - 2022-12-08
- integrated fixes and solved an issue that was incorrectly setting calculated active kW

## [20230112] - 2023-01-12
- added support (beta) for multiple control loops

## [20230113] - 2023-01-13
- beautified the PC Debug and optimized sungrow power control commands.

## [20230124] - 2023-01-14
- fixed issue in debug mode where it says power is set when inverter is not found

## [20230210] - 2023-02-10
- fixed issue with groups
- updated sungrow reactive power control on 7092
- fixed but where kW_Irradiance_Day was not calculated properly
- removed Meter Scale from PC config

## [20230215] - 2023-02-15
- fixed issue with reactive power not calculating properly

## [20230224] - 2023-02-24
- fixed issues with reactive control and sungrow
 
## [20230301] - 2023-03-01
- fixed a bug with default percent

## [20230406] - 2023-04-06
- added fixed PF override and PF package for utility scale PF adjustment

## [20230523] - 2023-05-23
- updated latest issues in power control

# [20230523] - 2023-08-28
- fixed a bug in percentage calculation when using multiple wattmons in a plant

# [20230928] - 2023-09-28
- updated logic for multi clusters

# [20240131] - 2024-01-31
- added 2 more clusters

# [20240305] - 2024-03-05
- update for Sineng inverter

# [20240417] - 2024-04-17
- fixed issue with curtailment day logging & save location for flash

# [20240627] - 2024-06-17
- integrated bus bar group joining from digital inputs

# [20240905] - 2024-09-05
- added meter option to search for kWh Import role

# [20250123] - 2025-01-23
- added a kwh max value for zero export meters

## [20250806 ] - 2025-08-06
- updated the plant size calculation for devices to ensure proper set points